Skip to main content
CHIDOZIE ELVIS OKAFOR
Portfolio Loading
ceokafor.com · Boston, MA
Construction + Project ManagementFeatured Project

Ritter Annex Hall Lobby Renovation

Lead PM from DD through CD on a 750 sq. ft. academic lobby renovation - Gallery of Success digital display wall, redesigned security desk, and a full P-Lam wall panel system.

In resumes:1A1B2A
Tools:AutoCADAdobe Photoshop
Year
Summer 2024
Category
Construction + Project Management
Type
Interior Architecture + Project Management
Size
750 sq. ft.
Phase
DD -> CD
Location
Temple University · Philadelphia, PA

Context

A targeted academic lobby renovation that turned a plain institutional arrival space into a more legible, durable, and specific visitor experience. The work combined existing-conditions documentation, design coordination, client visualization, and contractor procurement.

My Role

  • Served as Lead Project Manager from Design Development through Construction Documents
  • Field-documented all existing conditions and produced existing + proposed floor plans and reflected ceiling plans in AutoCAD
  • Created the complete P-Lam construction detail set: base detail, typical panel joint, head detail, wall panel cover, and recessed panel detail
  • Produced photorealistic before/after renderings in Adobe Photoshop for client approval
  • Managed all GC communications for pricing, cost estimates, and contractor procurement

Process

01

Existing Conditions Documentation

Surveyed the lobby and created the existing-condition base drawings in AutoCAD.

02

Design Development

Resolved the security desk, Gallery of Success display wall, and P-Lam system for design approval.

03

Construction Documents

Produced coordinated plans, RCPs, and detailed P-Lam fabrication information.

04

Contractor Procurement

Managed pricing conversations, cost estimates, and contractor communication.

Before + After

Before
Before the renovation
After
After the renovation

Technical Drawings

P-Lam detail set

Outcome + Impact

Delivered a complete CD package for a lobby that now has a clear academic identity through the Gallery of Success wall and redesigned security desk.

Resume Reference

This project appears in the following resumes. Download the one that matches the role you are hiring for.

Resume 1A
Construction + Real Estate Development
1A
Target Roles
Owner's Representative
Senior Project Manager
Download PDF
Resume 1B
Construction + Real Estate Development
1B
Target Roles
Director Capital Projects
Program Manager
Download PDF
Resume 2A
Architecture + Design
2A
Target Roles
Senior Project Architect
Architectural PM
Download PDF

Need a resume tailored to your specific job posting?

Request Tailored Resume